Unit Delay Simulation:
The netlist after synthesis, but before routing does not yet contain the clock tree. It does not make sense to use SDF backannotation at this step, but gatelevel simulation may be used to verify the reset circuit, the scan chain or to get data for power estimation. If no backannotation is used, simulators should use Libraries which have the specified block containing timing args disabled and using distributed delays instead. The default delay for a storage element at 10 ps, for a combinatorial gate 1 ps and a clock gating cell 0 is the most secure possibility to run unit delay simulation, and process size and performance are optimized if the specify block is disabled.
Full Timing Simulation (With SDF):
Simulation is run by taking full timing delays from sdf. The SDF file is used to back annotate values for propagation delays and timing checks to the Ver-ilog gate level netlist.
Comments are greatly appreciated.
thanks for this information on GLS
ReplyDeleteAfter the insertion of clock gates in the design, the gated clocks do not remain ideal. If you write out this type of design in Standard Delay Format (SDF) and then perform gate-level simulation (GLS) on the synthesized netlist using the SDF file, it can cause x propagation in the design because the gated clock is not ideal and will have different transition times at the output of the clock gates, depending on the respective loads. Make sure you edit the delays of the latches responsible for clock gating in sdf file to 0, so that the gated clock will be ideal.
ReplyDelete