Modern clock networks include several drivers in which delays are affected by the timing of their input signal transitions. How do you find out the input alignment of clock network drivers which leads to worst case driver gate delays?

What the question is really asking

Standard static timing analysis (STA) assumes that a gate's delay depends on one switching input at a time, its slew and its output load. That assumption breaks in two places that are common in clock networks:

  • Multi-input gates such as clock-gating cells, NANDs or muxes in the clock path, where two inputs can switch close together.
  • Multi-driven nets such as clock meshes and spines, where several buffers drive the same wire and their inputs arrive at slightly different times.

In both cases the delay you get depends on the relative arrival times, the skew, between inputs. The question asks how you find the alignment that gives the worst delay, so that the clock timing you sign off is safe.

The short answer

  1. Get the timing window of each driver input from STA: earliest and latest arrival, and the slew at each.
  2. Decide what "worst" means for the check: the latest arrival at the sinks for setup, the earliest for hold, or the largest skew between sinks.
  3. Simulate the drivers together with their real load (circuit simulation such as SPICE, or a characterized multi-input model), sweeping the relative arrival times within those windows.
  4. Keep the alignment that gives the worst value for each check. It is often not the case where all inputs arrive together.

Ordinary STA cannot do this on its own. A 2025 paper from UC Santa Cruz on clock meshes, GATMesh: Clock Mesh Timing Analysis using Graph Neural Networks, notes that there is generally some skew between mesh buffer inputs, and uses circuit simulation (Ngspice) as the reference because simple delay models handle several drivers on one net poorly.

Why the alignment changes the delay

When several drivers share one net and switch together, they share the load, so the net switches fast. When one driver is late, the early drivers carry the whole load for a while, and the late driver, still holding the old value, actively fights them. The transition slows, and current flows straight from supply to ground through the fighting drivers. A Texas A&M paper on buffered non-tree clock networks makes the same point: if the inputs of two buffers driving the same sub-net arrive at significantly different times, short-circuit power becomes a risk. It also notes that the short circuit cannot build up if the signal takes longer to travel along the wire from one buffer to the other than the arrival-time difference.

In a multi-input gate the effect can go either way. Inputs that switch together can speed up a parallel pull-up or pull-down path and slow down a series stack, so the worst case for one edge is not the worst case for the other.

Deep dive: the numbers and details

This part holds a worked example, the search method and the interview checklist. Skip it if the overview is all you need.

Worked example: two drivers on one net

The numbers here are illustrative, using a simple RC model. Two identical drivers each have an output resistance of 100 Ω, and they share a 1 pF net. We measure the 50% point of a rising transition.

CaseCalculation50% delay
Both switch togetherR = 50 Ω, τ = 50 ps, t50 = 0.69 × 50 ps34.7 ps
Driver 2 is 30 ps late and simply off until thenDriver 1 alone (τ = 100 ps) reaches 1 − e−0.3 = 25.9% in 30 ps; both then finish the rest with τ = 50 ps: 50 × ln(0.741 / 0.5) = 19.7 ps49.7 ps
Driver 2 is 30 ps late and still driving low (contention)The two drivers form a divider that heads for 50% with τ = 50 ps, reaching 0.5 × (1 − e−0.6) = 22.6% in 30 ps; then 50 × ln(0.774 / 0.5) = 21.9 ps51.9 ps

Delay is measured from driver 1's input. A 30 ps input skew turns a 34.7 ps delay into about 52 ps, a 50% increase, and during the 30 ps of contention a 1 V supply drives about 1 V / 200 Ω = 5 mA straight through the two drivers. Real drivers are nonlinear and the late driver's slew matters too, which is why the real answer comes from simulation, but the direction of the effect is the same.

A practical search method

  1. Bound the problem. From STA, take each driver input's arrival window [early, late] and slew range. Do not search outside what the upstream tree can produce.
  2. Start with the corners. Simulate all inputs early, all late, and each driver late while the others are early. With N drivers that is N + 2 runs, and it usually brackets the worst case.
  3. Refine. Around the worst corner, sweep the offset of the critical driver (or pair of inputs) in small steps, or use a binary or golden-section search on the delay. Delay against offset is usually smooth, so a few runs converge.
  4. Check both edges. Rising and falling transitions have different worst-case alignments, especially for multi-input gates with series and parallel stacks.
  5. Check the right metric. For setup, maximize the latest sink arrival. For hold, minimize the earliest. For skew, maximize the difference between two sinks; this can come from a different alignment than either of the first two.
  6. Use a model trick for two drivers. The Texas A&M paper above converts a two-driver net into an equivalent single-driver net by inserting a virtual resistance whose delay equals the arrival-time difference, so single-driver delay analysis still applies.
  7. Feed the result back. Annotate the worst-case delays into STA (as derates or as extra delay on the affected arcs), or redesign so the skew between driver inputs is small.

Design measures that shrink the problem

  • Balance the tree that feeds the mesh or the multi-driven net, so the input skew between drivers is small to begin with.
  • Size drivers on a shared net equally and place them evenly, so no single late driver carries a large share of the load.
  • Keep logic that combines clocks (gating, muxing) where its inputs are guaranteed to be far apart in time, or fully synchronous with the clock.

Interview checklist

  • Say why single-input STA is not enough: delay depends on the relative timing of several inputs.
  • Name the two cases: multi-input gates and multi-driven nets.
  • Explain contention and the short-circuit current it causes.
  • Describe the window-bounded sweep with circuit simulation, corners first.
  • Point out that the worst alignment differs by edge and by check (setup, hold, skew).

For background on clock trees and skew, see Clock Latency and Clock Skew and Clock Tree Theory: Zero-Skew and Bounded-Skew Trees on this blog.

Further reading

Share Facebook X LinkedIn WhatsApp Email

Post a Comment

0 Comments

Your comments will be moderated before it appears here.

Post a Comment (0)

#buttons=(Ok, Go it!) #days=(20)

Our website uses cookies to enhance your experience. Learn more
Ok, Go it!